Tender Notice for Drilling of Two Boreholes, Construction of Concrete Slabs, and Supply & Installation of Hand Pump Systems

Dufatanye Organization
📋 Job Details

📍 Location: Nyanza , Rwanda

📄 Type: Contract

🎓 Education: Not Specified

đŸ’ŧ Experience:

đŸ”Ĩ Trending Viewed 526 times.

đŸ‘Ĩ Positions: 1

📅 Deadline: 28/04/2026 17:00

🆕 Posted: 14/04/2026

🌐 Website: https://dufatanye.org/

Status: Active (9d 2h remaining)

👤 Who May Be Interested

Professionals seeking career advancement and individuals with relevant qualifications may be interested in this opportunity.

This opportunity is ideal for professionals interested in the role of Tender Notice for Drilling of Two Boreholes, Construction of Concrete Slabs, and Supply & Installation of Hand Pump Systems based in Nyanza , Rwanda. Qualified and motivated candidates are encouraged to apply for this contract opportunity.
â„šī¸ About This Opportunity

The position of Tender Notice for Drilling of Two Boreholes, Construction of Concrete Slabs, and Supply & Installation of Hand Pump Systems at Dufatanye Organization located in Nyanza , Rwanda offers an opportunity for qualified professionals to contribute their knowledge and experience in a dynamic working environment. The organization seeks individuals who are motivated, reliable, and capable of performing their duties effectively while maintaining professional standards.

⭐ Common Skills Required
  • Tax
  • Training
📄 Job Description

This job description has been adapted for JobNziza readers to provide a clearer overview of the opportunity.

TENDER DOCUMENT

Drilling of Two Boreholes, Construction of Concrete Slabs, and Supply & Installation of Hand Pump Systems

1. Background

Dufatanye Organization is a community-focused non-governmental organization committed to improving access to clean water, sanitation, and sustainable livelihoods in rural communities across Rwanda. Through its interventions, under the Village of Hope project, Dufatanye aims to reduce waterborne diseases, enhance hygiene standards, and enhance the quality of life for vulnerable populations.

This project, titled “Village of Hope”, is implemented in partnership with the Suyana Foundation, an organization dedicated to supporting sustainable water access and community resilience initiatives globally.

Under this partnership, Dufatanye seeks to enhance access to safe and reliable water sources in Nyanza and Nyaruguru Districts through the construction of boreholes equipped with hand pump systems.

2. Scope of Work

A. Borehole Drilling

1. Borehole Drilling (Nyanza District)

Site Location

  • Province: Southern Province
  • District: Nyanza
  • Sector: Rwabicuma
  • Location: Mubuga-Nyamiseke

Specifications

  • Number of boreholes: 1
  • Expected depth: 0m–100 meters (as determined by hydrogeological survey)
  • Diameter of drilling: 6”

Required Activities

  • Drilling (RIG MACHINE PRD SPD STALL)
  • Casing installation (125mm PVC)
  • Gravel packing (size 4.3mm of Gravel)
  • Well development (airlifting)
  • Test pumping (yield test maximum expected 1.5m³/h)

2. Borehole Drilling (Nyaruguru District)

Site Location

  • Province: Southern Province
  • District: Nyaruguru
  • Sector: Rusenge
  • Village: Mariba-Rusaniro

Specifications

  • Number of boreholes: 1
  • Expected depth: 0m–120 meters (as determined by hydrogeological survey)
  • Diameter of drilling: 6”

Required Activities

  • Hydrogeological survey (already completed)
  • Drilling (RIG MACHINE PRD SPD STAR)
  • Casing installation (125mm PVC)
  • Gravel packing (size 4.3mm of Gravel)
  • Well development (airlifting)
  • Test pumping (yield test maximum expected 1.5m³/h)

B. Construction of Concrete Slabs for 2 Boreholes

Purpose:

  • Borehole protection and pump base

Type:

  • Reinforced concrete slab

Typical Specifications:

  • Thickness: 100 mm
  • Diameter: 1.5–2 meters around borehole

Must Include:

  • Drainage slope extending 6 meters away from borehole
  • Soak pit or runoff channel
  • Protective apron to prevent contamination

C. Pump Supply & Installation

Pump Type:

  • Hand pump

Requirements:

  • Pump capacity aligned with borehole yield
  • Consideration of total dynamic head (depth + elevation)
  • Supply and installation of pipework (rising main)
  • Installation of all accessories (pump head, rods, cylinder, etc.)
  • Training of local users on pump operation and basic maintenance

3. Technical Specifications

The contractor must adhere to the following standards:

  • Drilling method: (rotary, percussion, or suitable method based on geology)
  • Casing material: uPVC (125 mm diameter)
  • Gravel pack: clean, washed gravel (4.3 mm size)
  • Concrete grade: C20/25
  • Compliance with Rwanda national water standards and international best practices
  • Proper sanitary sealing to prevent contamination

4. Deliverables

The contractor shall deliver the following:

  • Borehole log (detailed geological profile)
  • Pump test results (yield, drawdown, recovery)
  • Water quality analysis report (physical, chemical, bacteriological)
  • As-built drawings
  • Operation & Maintenance (O&M) manual
  • Completion report including photos and GPS coordinates

5. Timeline

  • Mobilization: 1 week
  • Drilling (2 boreholes): 2–3 weeks
  • Slab construction: 1 week
  • Pump installation: 1 week

Total estimated project duration: 5–6 weeks

6. Qualification Requirements

Bidders must submit:

  • Proven experience in similar borehole drilling projects
  • List of equipment (drilling rig, compressors, assist vehicles, etc.)
  • Qualified personnel (hydrogeologist, drilling engineers, technicians, companies )
  • At least 3 past project references with contact details
  • Company registration documents and tax clearance
  • Work plan and methodology

7. Clarifications

  • Dry Borehole Responsibility:
    The tender must clearly state whether the contractor or the client bears the risk and cost in case of a dry borehole.
  • Warranty Period:
    Minimum 12 months warranty on workmanship, materials, and installed pump system.

8. Additional Requirements

  • Health, Safety, and Environmental (HSE) plan must be submitted
  • Community engagement during implementation is required
  • Site restoration after works completion
  • Contractor must ensure minimal environmental impact
  • Compliance with local authority regulations

9. Submission Details

  • Submission Deadline: 28 April 2026 at 5:00 PM
  • Submission Method: Email submission
  • Email Address: carine.dufatanye@gmail.com
  • Email Subject Line: borehole construction+ name of sender (eg: borehole construction +Dufatanye Organization)

Note:
All bids must be submitted electronically before the deadline. Late submissions will not be considered.

Done at Nyanza 13th April 2024

KAREMA Godfrey

The Founder and CEO

Dufatanye Organization

📎 Attachments Documents
drilling-two-boreholes-construction-concrete-slabs-and-supply-installation-hand-pump.pdf
PDF file

📌 Check job description for application instructions.
âŗ 9d 2h remaining
📝 Application Tips
  • Ensure your CV highlights relevant experience related to the position.
  • Include measurable achievements in your application documents.
  • Review the job description carefully before submitting your application.
  • Prepare supporting documents such as certificates and references.
  • Submit your application before the deadline.
⚠ Job Notice

JobNziza publishes employment opportunities to help job seekers discover career openings across Rwanda. Applicants should carefully review job requirements and verify application instructions before applying.

âš ī¸ Important: JobNziza does NOT charge any fees for job applications. Never pay money for a job. Report suspicious listings.

Source: Job listing adapted for JobNziza readers.